Nutrient samples were collected from six river stations on February 18th. In the five days prior to sampling, 0.25” of precipitation were recorded at T.F. Green.
Among the river stations sampled, the highest total nitrogen (TN), total dissolved nitrogen (TDN), and dissolved inorganic nitrogen (DIN) were observed at Blackstone River @ Slater Mill (TN = 1,430 ppb, TDN = 2,170 ppb, DIN = 1,249.2 ppb). The lowest TN, TDN, and DIN were observed at Moshassuck River @ Higginson Ave. (TN = 710 ppb, TDN = 702 ppb, DIN = 595.9 ppb).
The next scheduled sampling date is March 4th, 2026.
