Nutrient samples were collected from seven river stations and eight bay stations on March 20th. All bay stations were sampled at the surface and bottom. In the five days prior to sampling, there were 0.2 inches of precipitation recorded at T.F. Green.
Among the river stations sampled, the highest total nitrogen (TN) and total dissolved nitrogen (TDN) were observed at Blackstone River @ Bikepath Bridge (TN=906 ppb, TDN = 928 ppb), while the highest dissolved inorganic nitrogen (DIN) was at the Blackstone River @ Slater Mill (DIN=735 ppb). The lowest TN, TDN, and DIN were observed at Moshassuck River @ Higginson Ave (TN=559.5 ppb, TDN=567.5 ppb, DIN=401 ppb, all averaged with duplicates).
Among the bay stations sampled, the highest surface TN, TDN, and DIN were observed at Phillipsdale Landing (TN = 1,080 ppb, TDN = 961 ppb, DIN = 765 ppb). The lowest surface TN, TDN, and DIN were observed at the Bullock Reach Buoy (TN = 460 ppb, TDN = 177 ppb, DIN = 73 ppb). Chlorophyll a concentrations at the surface bay stations averaged 6.22 μg/L overall with a maximum of 15.01 μg/L at the Bullock Reach Buoy.
The next scheduled sampling date is April 3, 2024.