April 16-17, 2025

Nutrient samples were collected from seven river stations on April 16th and seven bay stations 17th. All bay stations were sampled at the surface and bottom except for one station (India Point Park) which was only sampled at the surface. In the five days prior to sampling, 0.80 inches of precipitation were recorded at T.F. Green. Due to a laboratory issue, some ammonia and dissolved inorganic nitrogen (DIN) results for the bay and river samples are not available. The DIN for both the bay and river stations will be based on the results available.

Among the river stations sampled, the highest total nitrogen (TN) was observed at Blackstone River @ Slater Mill (TN = 953 ppb). The highest total dissolved nitrogen (TDN) and dissolved inorganic nitrogen (DIN) was observed at Pawtuxet River @ Broad St. (TDN = 930 ppb, DIN = 673 ppb). The lowest TN and TDN were observed at Moshassuck River @ Footbridge at Mill St. (TN = 569 ppb, TDN = 517 ppb). The lowest DIN was observed at Blackstone River @ Bikepath Bridge. (DIN = 614 ppb).

Among the bay stations sampled, the highest surface total nitrogen (TN), total dissolved nitrogen (TDN), and dissolved inorganic nitrogen (DIN) were observed at Phillipsdale Landing (TN = 1,250 ppb, TDN = 975  ppb, DIN = 801 ppb). The lowest surface TN and DIN concentrations were observed at Conimicut Point (TN = 504 ppb, DIN = 79 ppb). The lowest surface TDN was observed at the Bullock Reach Buoy (TDN = 178 ppb).

The next scheduled sampling date is April 30, 2025.

Scroll to Top